Communication networks in the factory
To keep the data flowing
Sensors, machines, robots, tools - everything in the factory communicates with everything else. Lapp provides the high-performance communication infrastructure. This includes cables that can be quickly assembled, robust switches and a number of other innovations.

Install connection couplings without tools
Parker Hannifin now offers new quick couplings for its NSA series that enable simple, tool-free installation. The NSA couplings are available in different material variants.
3 grams of adhesive hold a truck weighing several tons
According to the Guinness Book of Records, Delo has the strongest adhesive in the world. 3 grams of Delo Monopox hold a 17.5-ton truck above the ground for one hour. The truck is suspended from a bonded aluminum cylinder with a diameter of 3.5 cm.

Company founder Franz Binder has died
Franz Binder, founder of the Neckarsulm-based connector manufacturer, passed away on May 20 at the age of 90.

Binder takes over insolvent Eureca companies
Binder took over the business operations of the insolvent companies of the Eucrea Group, headquartered in Pforzheim, with retroactive effect from June 1, 2019.
Securely and quickly connected

Weco is now offering the new Series 308 blade terminal solutions. The flat plug distribution strips are available in 1 to 16-pole versions and are suitable for use in household appliances, instantaneous water heaters or motorhomes.
Cable carriers delivered to the line ready for installation

LQ Mechatronik-Systeme offers the production of complete, ready-to-install cable carrier systems. The company organizes everything on request, from engineering and assembly to shipping on adapted transport racks and comprehensive service.
Sometimes millimeters decide

The M12 Mini from Provertha is the most compact M12 cable connector for space-saving fieldbus connection. The M12 cable gland has a length of just 44 millimetres with an outer diameter of 16/14 millimetres.
Laying of the foundation stone
Erni builds new company headquarters in Virginia

Erni has laid the foundation stone for a modern production and distribution building in Chesterfield County, Virginia. The new building will house production and the company headquarters in the USA. The opening is planned for December 2019.


