Europe's largest blasting plant plannedZell grows and plans the move
The technically leading and largest blasting plant in Europe is to be built in Rottenacker on the Danube. The Zell company from Ehingen-Volkersheim has planned a production and dispatch hall measuring around 3,000 square meters, which will be equipped with 56 newly developed and self-built Zell blasting systems.
Special version of a workpiece carrier: the grid system. It is an automated transport system made of steel that was specially developed for the hardening process. It withstands temperatures of up to 1,200 degrees Celsius without distortion and eliminates the need for recharging before and after the hardening furnace. © Cell
